Production control
Release work with the right revision.
Carry the approved item, BOM, routing, work centre, components, quantities, and dates from the manufacturing plan onto the shop floor.
Control the work, not just the order status
The production record connects engineering definition, material consumption, operation progress, quality evidence, and reported output.
- Define
Release BOM revisions, component effectivity, routings, operations, and work-centre standards.
- Release
Convert an approved planned order into a production order with required dates and quantity.
- Stage material
Reserve and issue the correct components, lots, and quantities to the order.
- Run operations
Use job cards to record work centre, sequence, planned time, actual time, and status.
- Report output
Capture completed, rejected, and remaining quantities before the order closes.
- Trace actuals
Carry material and operation actuals into WIP, variance, inspection, and cost.